Connect2 – proposals for Drayton Park and Gillespie Road

Echelon parking and double parking on Drayton Park - credit Pat Tuson

The width restriction on Drayton Park has raised a lot of wider issues about this cycle route. It’s also a Connect2 route chosen by Sustrans for a complete overhaul for pedestrians and cyclists.

Prompted by a comment on twitter for a ‘proper cycle lane on Drayton Park’, here is the the short list of ideas that council officers are currently working on. It’s a large file full of photos. Comments about any of the proposals are welcome.

ICAG has emphasised the need for covered cycle parking outside the Arsenal Tube station and the removal/relocation of the echelon parking close to Drayton Park station.

For quick reference, here is the short List of possible Schemes (text only). (Item 10 may refer to the whole of Drayton Park or even the whole cycle route.)

1) Gillespie Road – entrance to Tannington Terrace
Proposals:
Raise crossover to same level as footway and construct with ASP flags on reinforced concrete.
Benefits: Provides a continuous step free pedestrian walkway for increased pedestrian safety.
Estimated Construction Cost: £5000

2) Gillespie Road by Tannington Terrace
Proposals:
Install cycle stands as possible.
Housing land, will need to secure agreement with housing
Benefits: Good location for cycle stands.
Estimated Construction Cost: £5,000

3) Crossover opposite Drayton Park junction with Elfort
Road
Proposals:
Raise crossover to same level as footway and construct with ASP flags on reinforced concrete.
Benefits: Provides a continuous step free pedestrian walkway for increased pedestrian safety.
Estimated Construction Cost: £5000

4) Arsenal Stadium entrance 2 to Box Office
Proposals:
Create a raised 2 metre wide buildout in reinforced materials to match existing footways
Benefits: Large shared priority area with enhanced speed reducing features. Increases pedestrian perception of space.
No loss in parking due to presence of existing parking restrictions.
Installation of red blossom trees not costed.
Estimated Construction Cost £50,000

5) Arsenal Stadium entrance 2 to Box Office
Proposals:
Create a raised 2 metre wide buildout in reinforced materials
to match existing footways
Benefits: Large shared priority area with enhanced speed
reducing features. Increases pedestrian perception of space.
No loss in parking due to presence of existing parking restrictions.
Installation of red blossom trees not costed.
Estimated Construction Cost £50,000

6) Drayton Park – Tree Lined Verge
Proposals:
Take up and relay surfacing surrounding existing tree lined
verge with resin bonded material to prevent further tree root
damage
Benefits: Reduces trip hazards for pedestrians, increases effective available walking space, reduces unsightly cracks and water ingress to further damage the paving.
Estimated Construction Cost £125,000

7) Drayton Park / Aubert Park
Ready for Implementation
Install Pedestrian refuge in Aubert Park
Possible removal of existing roundabout after safety audits are carried out.
Estimated Construction Cost £20,000

8 ) Drayton Park junction with Whistler Street
Proposals:
Raise two crossovers to same level as footway and construct with ASP flags on reinforced concrete.
Benefits: Provides a continuous step free pedestrian walkway for increased pedestrian safety.
Cost: £12,000

9) Drayton Park mainline station
Proposals:
Construct footway buildout to same level as footway and construct with ASP flags on reinforced concrete.
Benefits: Physically narrows carriageway to help reduce vehicular speeds, Increases pedestrian space. No loss in parking due to presence of existing parking restrictions.
Cost: £30,000

10) 56 – 80 Drayton Park – realignment of cycle lanes
Proposals:
Realign cycle lanes to back of carriageway and upgrade to current LCDS.
Benefits: Facilitation of safer cycle movement, reduced conflicts with motor vehicles and increased pedestrian safety as a result of the associated new zebra crossing
Estimated Construction Cost: £65,000

11) Drayton Park – Crossover opposite mainline station
Proposals:
Raise crossover to same level as footway and construct with ASP flags on reinforced concrete.
Benefits: Provides a continuous step free pedestrian
walkway for increased pedestrian safety.
Estimated Construction Cost: £5000

12) Drayton Park / Arvon Road pedestrian crossing point /central refuge
Proposals:
Extend existing buildout and construct new central refuge and dedicated pedestrian crossing point
Benefits: Safer crossing point for pedestrians, increased perception of space and reduction in vehicle speeds.
Estimated Construction Cost £20,000

13) Arvon Road
Proposals:
Replace existing tarmac footway with ASP flags in line with current standards. Resurface carriageway.
Benefits: Increases pedestrian comfort and alleviates hazards from existing potholes where the tarmac has worn away
Estimated Construction Cost: £45,000

14) Arvon Road – Drayton Park School
Proposals:
Look into replacing unsightly guardrail with alternatives such as buildouts and trees.
Benefits: Aesthetic improvements to the environment
Estimated Construction Cost: £30,000

15) Arvon Road – Junction with Witherington Road
Proposals:
Create a raised shared space by constructing raised entry treatment in reinforced materials to match existing footways
Benefits: Continuous pedestrian crossing point, speed reduction benefits and an increased pedestrian perception of space
Estimated Construction Costs £25,000

16) Cycle symbols along entire Connect2 Route
Proposals:
Approximately 30 cycle symbols along route to define and provide directions to cyclists.
Benefits: Increase awareness of cyclists of the route.
Estimated Construction Cost: £1,500

17) Quill Street – Gillespie Park
Proposals: Build new ramped access with handrail.
Estimated Construction Cost £20,000.

18) Gillespie Park – Seven Sisters
The possibility of a ramp at the other end of the park by Seven Sisters road has been looked at by Greenspace and not deemed possible due to constraints by network rail and the level gradients being too severe. We will ensure however that the area is cleaned and tidied. Possibility of Mural or sculpture works at this end.
Estimated Construction Cost 5,000.

19) General repairs to carriageways and pavements in
Gillespie Rd, Drayton Park and St Thomas’s Road
Proposals:
Estimated Construction Cost £50,000.
Proposals:

20) Install sinusoidal humps or explore the possibilty of chicanes outside 82 and 154 Drayton Park.